Intake Area before Restoration 10Aug09 |

River after Shorefox Incident - July09 |

Clean Water Diversion 07Oct09 |
| |

Upper diversion with plastic liner 7Oct09 |

Working within clean water diversion 7Oct09 |

Lower coffer dam keeps sediment at bay 16Oct10 |
| |

Temporary intake pipe 7Oct09
|

Working within clean water diversion 7Oct09
|

Lower coffer dam keeps sediment at bay 16Oct10
|
| |

Heavy organic mud in upper river left slough 8Oct09
|

Boulders from Linke pit ready to go in river 7Oct09
|

Setting keystone boulder at apex of vane 8Oct09
|
| |

Continuing river right arm 12Oct10 |

Completed vane 28Oct09 |

Dewatering bag recieves muddy water and captures sediment under CDHPE dewatering permit 23Oct09 |
| |

Burrito blanket laid into trench and begin gravel bed 26Oct09 |

Gravel for burrito actually a relleno 23Oct09
|

Delivering intake pipe to burrito, clean water bypassing 26Oct09
|
| |

Intake pipe in place 26Oct09
|

Burrito in place smothered in native river cobble 28Oct09
|

Removing clean water diversion 28Oct09
|
| |

Heavy duty crane lifted intake vault into place 3Nov09
|

Intake vault in place 2Nov09
|

Suppliers were eager to supply BuyAmerican materials 13Oct09
|
| |

Iindividual slide gates for each intake pipe 4Nov09
|

Beginning riparian habitat work to narrow and deepen channel and increase floodplain 2Nov09
|

Completed gravel bar with willow 4Nov09
|
| |

Willows were installed on gravel bars 2Nov09
|

Excavated river cobble filled over boulder backbone 6Nov09
|

Boulders continue up onto bank to offer access and rest spot 6Nov09
|
| |

Completed lower riparian gravel bar 6Nov09
|

Gravel bar and low flow channel 15Oct10
|

Completed bar with backwater disconnected from surface of intake area
|
| |

Riffle crest set over intake 20Nov09
|

View upstream across intake note sinuous flow 20Nov09
|
|
| |
|
|
|
| |
|
| |
Intake & River Restoration Monitoring 2010 |
| |
|
|
|
| |

Ice off looking upstream note good sinuosity 7Apr10
|

Working on vault plumbing 14Apr10
|

Runoff increasing to 260 cfs on 20Apr10
|
| |

Off channel habitat at 100 cfs 3May10
|
Otter or beaver use 3May10
|

Runoff backing into off channel habitat 3May10
|
| |

Runoff up to 1,000 cfs on 25May10
|

Upstream at 1,000 cfs 25May10
|

1,000 cfs flooding backwater 25May10
|
| |

Even bigger runoff 1June10
|

Runoff flooding weir - upstream riparian area is good 1June10
|

Runoff going into backwater area 1June10
|
| |

Peak flow 2,100 cfs on 7June10
|

2,100 across intake on 7Jun10
|

Looking downstream at 2,100 cfs 7Jun10
|
| |

Receding upstream 24June10
|

Receding to 900 cfs across intake 24June10
|

Receding to 750 cfs note 2009 point bar emerging upstream 29Jun10
|
| |

750 cfs still flooding slough 29June10
|

750 cfs note sediment capture on upstream 2009 point bar 29Jun10
|

750 cfs waves at vane invert 29Jun10
|
| |

750 cfs backwater 29Jun10
|

Coarse woody debris captured by willow 29June10
|

750 cfs still flooding upstream 29June10
|
| |

Coarse woody material captured on point bar
|

Log captured by willow planted in 2009
|

Coarse woody material captured and now growing 29Jun10
|
| |

Log-capturing willow still healthy 29Jun10
|

Flow down to 275 cfs with upstream point bar fully emerged on 17July10
|

RL backwater at 275 cfs 17July10
|
| |

Winter bypass at 115 cfs with anglers upstream 18Sept10 |

Winter bypass across intake 18Sept10 |

Engineering team reviewing site with CDPHE Andy Poirot on 1Oct10 |
| |

Angler at 110 cfs 1Oct10 |
|
|
| |
|
|
|
| |
|
| |
|
Water Tank |
|
| |
|
|
|
| |

Existing buried concrete tank on 29April09 |

Looking down at new tank site on 29Apr09 |

Pre-bid tour on 18Aug10 |
| |

Early digging 15Mar10 |

Team watching drilling 15Jun10 |

Tough going 15Jun10 |
| |

Drilling blast holes 30Jun10
|

Siesmograph - little orange box on old tank 5July10
|

Team powow to discuss early blasting results 8Jul10
|
| |

Preparing for Blast #3 on 13Jul10
|

Dynamite on 13July10
|

Blasting pattern 13Jul10
|
| |

Blasting heaps material up and ready to be excavated 13July10
|

Blast mat job well done 8Jul10
|

A total of 2600 yards of material were blasted and removed
|
| |

Great job protecting the old tank - 23July10
|

Cleaning to prepare for mud mat 28Jul10
|

Merrick Project Engineer Curt Thompson -on right- photographing progress 28Aug10
|
| |

Mud matt started on 2Aug10
|

Garneys crew boss Tino directing next phase 4Aug10
|

Kumar Steve Mulligan concrete quality control 10Aug10
|
| |

Pouring tank base - note rebar pattern 10Aug10
|

Inner wall forms up quickly 13Aug10
|

Interior forms - note plumb bobs 13Aug10
|
| |

Everist Concrete suppling concrete, pouring walls 13Aug10
|

Garney crew safety first and excellent teamwork 23Aug10
|

Garney Project Manager Brock Southwick and Merrick Engineer Ed Duerr -25Aug102
|
| |

Garney precision concrete team 30Aug10
|

View of tank from town 18Sept10
|

Tank structural fill compaction 28Sept10
|
| |

CDPHE Project Engineer Andy Poirot visits team on 29Sept10
|

Mayor Hershal helping install Solarbee solar-powered mixer into old tank 13Aug10
|

Engineer Ed Duerr basking with Solarbee mixer
|
| |

Tank bankfill 9-29-10
|
|
|
| |
|
| |
|
|
|
| |
|
|
|
|

First step installing yard piping 4-7-10
|

First pour clear well sump 4-22-10
|

Mountain Parks Electric 5-10
|
| |

Pour clear well floor - excellent teamwork 5-14-10
|

Clear well walls form baffles for longer residence time 5-25-10
|

Moving dirt 6-8-10
|
| |

Clear well 6-8-10
|

Clear well 6-8-10
|

Pour clear well deck which becomes filter room floor 6-15-10
|
| |

Metal building walls go up requiring serious teamwork 6-24-10
|

Metal walls going up 6-24-10
|

Metal walls going up
6-24-10
|
| |

Filter skid delivery -- tight fit! 7-17-10
|

Filter - 8-25-10
|

Filter - 8-25-10
|
| |

Jack 8-25-10
|

Walt and Jim 9-17-10
|

Jack with new computerized system 9-24-10
|